ROLLWISE · OPERATIONS TERMINAL

BUILD BOARD

data collected Jul 21 · 16:10 · latest deploy: success
SNAPSHOT STALE — THE REFRESHER HAS NOT PUBLISHED IN 20+ MINUTES
READY FOR YOUR WALKTHROUGH7
WAITING ON YOU0
ACTIVE AGENTS0

WORKERS — LIVE OR LAUNCHING

0 conveyor · 0 spec/ops. Exact process proof or labeled launch grace only.

No proved-live or launching Codex workers right now.

REGISTRY DEBT — 0

Rows that still say running but no longer prove active capacity.

No stale running rows.

RIGS — GATE FLEET

Self-hosted runners show whether the gate machines are reachable and occupied; Desktop Gate runs are gate load. Other active Actions are labeled separately and never counted as gates.

rollwise-box

online · idle

rollwise-desktop

online · idle

Other Actions · CI

ship(grounding): surface orphaned analytics boards in Analysis desk +… · in progress · 2m ago · not gate load

PLATFORM SIGNS — TEST vs HOLD

Green: live on prod and stable — worth your time. Amber: a rework is already in flight; today's version is being replaced.

Warehouse returns — Warehouse → Returns

NEW (088): full returns/RMA flow — create a return, split lines by disposition (restock vs scrap), watch inventory and drawer custody follow. Approve/post stays disabled until the posting engine ships, by design.

QR-to-Quote promotion — Quotes

NEW (065a): promote a quote request's lines into a real quote in one atomic step — catalog identity, package rounding, and pricing facts carry over; any failure rolls the whole promotion back.

Month-end close — Accounting → Close

NEW (103 slice 1): the guided close wizard — period foundation, receipt grammar, target-path selection. Slice-2 UI is queued.

Schedule calendar — Installation → Calendar

NEW (089): month/week schedule with day/week drill-in; accounting persona gets read-only Schedule.

Outbound email slice 1 — Settings + invoice/statement send

NEW (091): the send pipeline foundation. Sending-identity setup (091a) is specced next; today it proves the pipeline end to end.

Dispatch board — Installation → Dispatch

The day-grouped demand rail with drag-to-crew capacity and Will Call lanes — stable since ship, worth a second pass with real data.

Job page — custody, documents, right-click verbs

Stage strip IS custody (Office→Production→Billing→Closed); billing locks order entry with GM override; Documents is a plain folder.

Sales dashboard + goals

Your 11 rulings are mid-build (round 2).

Books secondary nav + ready-to-invoice

The F79/F80 rework is built and queued — current layout is on its way out.

WAITING ON YOU

WORKBENCH — BUILD & REVIEW

Eight successful stages run from Build through Deploying. Receipt-unavailable is an owned retry state; Escalation is halted and never completes a prior stage.

RECOVERY / EXCEPTIONS

Receipt unavailable lanes keep retrying workflow-specific proof. Escalated lanes are halted; neither state completes Deploy closure.

No lanes are in receipt recovery, production pause/proved, or escalated states.

DEPARTURES — GATE → SHIP → DEPLOY

Reviewed lanes couple into trains and take the gate once, integrated. Status words come from the same registry-authoritative stage map as the root wall.

Train B — warehouse & infra
BuildSQL gateIndependent lensesFixingClosure verifyFull gateShipDeploying
PLANNED
curated assembly plan · no active registry lane
089 SHIPPED (82c7eb1f). 088 warehouse-returns is CLOSED on prod (conveyor.ship.done 22:02Z; ship 7e9d37d; Deploy 29492918453 attempt 2 green). Closure had been blocked by a critical-lane sign-off DETECTABILITY defect (the §9 088 sign-off carried the exact ship commit only in its signoff-log heading while has_exact_signoff searches the section body); orchestrator added 7e9d37d to the body, re-armed escalated->production-proved, and the conductor completed code-owned closure. 090 remains canonically blocked on 065a shipment, then 094 follows left-to-right; neither is dispatchable yet.
Warehouse returns (088) — LIVE 7e9d37d00e64359b13e74de73fd1146202e45541Cycle count (090)Hosted staging wiring (094)
Train C — UI slices
BuildSQL gateIndependent lensesFixingClosure verifyFull gateShipDeploying
PLANNED
curated assembly plan · no active registry lane
Members review-fixed and committed; boards after Train B ships + the daylight dirty-tree review.
Onboarding UI (084b)Notifications UI (085b)Sales polish round 2 (F78)
Train D — Books chain
BuildSQL gateIndependent lensesFixingClosure verifyFull gateShipDeploying
PLANNED
curated assembly plan · no active registry lane
Members review-fixed and committed; boards after Train C.
Books nav + ready-to-invoice worklist (F79/F80)Tertiary tabs (F79)

DRAFTING ROOM — SPECS IN REVIEW

Unified line entry + repeat turnsAPPROVED AND MERGED at 97783f54 after independent Terra@high task-mrmwejrt-owew90 returned APPROVE with zero findings. Canonical catalog identity, work/sale quantity semantics, package rounding, dependency confirmation, visual-only drag order, and shared QR/JR/Quote/Job line authority are synchronized. The first implementation slice, 065a atomic QR-to-Quote catalog-backed line promotion, is LIVE via Deploy 29504827040 attempt 2 at exact head 37f10fa2; no product decision or dependency on 102/088 remains.
Integrated payments (106)v6 REVISED. Product/Settings returned 4 blockers and Money/SQL returned 14; the orchestrator ruled all 18 in .reviews/106-round6.md. Economic Luna@medium task-mrmnisj1-hap91l owns the consolidated spec revision while the independent tenancy review finishes in parallel.
Posting engine (107)v4 APPROVED with zero findings by independent xhigh closure review and merged to main at b27e4b73. Exact approved inventory: 49 governed entry points, 44 fact rows, 36 population keys, correct check first-post cohorts, 093 cash-journal evidence, 103 standalone-vendor parity, and complete 097 lifecycle coverage.
Branch GL dimension (f9a, amends PE)APPROVED v8 — eight critical rounds, final 0 findings. Branch as a dimension on journal facts; shared chart; 11-owner dual-write same migration set; exhaustive backfill; Branch-99-safe consolidation. PE.1 unblocked to build against this contract when its ladder position arrives.
Accounting re-shelve (080a)APPROVED v2 — two rounds, final 0 findings. Accounting Today root, final-slice atomic label+alias flip, close-route prerequisite, gates preserved. Builds after Train C (Train D slot).
Progress billing amendment (098a)APPROVED v7 — seven critical rounds, final 0 findings; worked example + micro-examples independently recomputed. SOV/pay-app/cohort-retainage/lien-waiver machinery for progress billing, both models first-class per Dereks ruling. Builds in the PE phase.
Platform back-office (097)Round-3 REVISE 6+1 — three judgments RULED (actor bound to auth.uid so forged-actor is provable; two external-effect regimes by originator; closed closure-reason enum). v5 executing.
Projects · Templates · Retention (098/099/100)098 v6 + 100 v6 APPROVED (ff8626bf) — cross-family re-review task-mrnyo8u9 returned APPROVE 0/0/0, closing the trio review round. 099 stays F86-ruled docs-only (Derek 2026-07-13). Trio spec desk clear.
Platform IA (105)APPROVED v7 — five cross-family review rounds closed 2026-07-16 (final round task-mrob0lcu, 0 findings). Platform IA authority; F95/F96 spec-eligible per its §9 sequencing.
Material match integrity (F97)v3 APPROVED (ff8626bf) — cross-family re-review task-mrnyo2n5 returned APPROVE 0/0/0 (migration-order check vs 20260716060400 passes), closing review round (4/4, two orchestrator rulings applied). Spec-clears 101.
Positioning & onboarding-pricingResearch evidence COMMITTED (both legs). Synthesis + rulings await your session.
Marketing site — artistic directionAwaits a dedicated session with you by design (craft project).
Full-Production Doctrine + SmartFloors (00G)Standing doctrine; gap register live.
Warehouse re-home + print queue (F95/F96)APPROVED v10 — ten cross-family rounds (final task-mrok93ta, 0 findings); 22 blocking closed, five orchestrator rulings recorded in the spec. Build-ready; builds gate on Trains B-D. OQ-5 (dual-unit roll display) remains on your desk.
Role-based Today depth (086)Approved; the designated filler lane when a slot idles.
Smart reconciliation (093)APPROVED v9 — Derek read-through + UX gate satisfied (match-card pairing, teach-a-rule, batch receipts, guaranteed undo); four review rounds, final 0 findings. Builds behind the visible-surface chain.

ARRIVALS — DEPLOY EVIDENCE

LIVE088-returns · ship commit 7e9d37d00e64359b13e74de73fd1146202e45541
LIVE103-close · ship commit 5d31f55b4df323e00275a59034c47e877205b87e
LIVE091-outbound-email · ship commit b7f7b77a06dd1c69eb33c6138cf1369737fca191
LIVE089-calendar · ship commit 82c7eb1f3d116d935819b5318d60efecae385f33
LIVEf98-integrity · ship commit ee65a3762e016444859d1f50f2efa6cda3188f6b