| GROUND · SOLO TURNOVERSEach storefront takes its own final inspection, then turns over. | |||
| LEVEL 2 · TRAIN B — WAREHOUSE & INFRA089 SHIPPED (82c7eb1f). 088 warehouse-returns is CLOSED on prod (conveyor.ship.done 22:02Z; ship 7e9d37d; Deploy 29492918453 attempt 2 green). Closure had been blocked by a critical-lane sign-off DETECTABILITY defect (the §9 088 sign-off carried the exact ship commit only in its signoff-log heading while has_exact_signoff searches the section body); orchestrator added 7e9d37d to the body, re-armed escalated->production-proved, and the conductor completed code-owned closure. 090 remains canonically blocked on 065a shipment, then 094 follows left-to-right; neither is dispatchable yet. | |||
| 2A | Warehouse returns (088) — LIVE 7e9d37d00e64359b13e74de73fd1146202e45541 | SCHEDULED | |
| 2B | Cycle count (090) | SCHEDULED | |
| 2C | Hosted staging wiring (094) | SCHEDULED | |
| LEVEL 3 · TRAIN C — UI SLICESMembers review-fixed and committed; boards after Train B ships + the daylight dirty-tree review. | |||
| 3A | Onboarding UI (084b) | SCHEDULED | |
| 3B | Notifications UI (085b) | SCHEDULED | |
| 3C | Sales polish round 2 (F78) | SCHEDULED | |
| LEVEL 4 · TRAIN D — BOOKS CHAINMembers review-fixed and committed; boards after Train C. | |||
| 4A | Books nav + ready-to-invoice worklist (F79/F80) | SCHEDULED | |
| 4B | Tertiary tabs (F79) | SCHEDULED | |
NEW (088): full returns/RMA flow — create a return, split lines by disposition (restock vs scrap), watch inventory and drawer custody follow. Approve/post stays disabled until the posting engine ships, by design.
NEW (065a): promote a quote request's lines into a real quote in one atomic step — catalog identity, package rounding, and pricing facts carry over; any failure rolls the whole promotion back.
NEW (103 slice 1): the guided close wizard — period foundation, receipt grammar, target-path selection. Slice-2 UI is queued.
NEW (089): month/week schedule with day/week drill-in; accounting persona gets read-only Schedule.
NEW (091): the send pipeline foundation. Sending-identity setup (091a) is specced next; today it proves the pipeline end to end.
The day-grouped demand rail with drag-to-crew capacity and Will Call lanes — stable since ship, worth a second pass with real data.
Stage strip IS custody (Office→Production→Billing→Closed); billing locks order entry with GM override; Documents is a plain folder.
Your 11 rulings are mid-build (round 2).
The F79/F80 rework is built and queued — current layout is on its way out.
| Δ1 | 088-returns · LIVE |
| Δ2 | 103-close · LIVE |
| Δ3 | 091-outbound-email · LIVE |
| Δ4 | 089-calendar · LIVE |